The key point that i made this week was was the feature that i was going to produce, what would the feature contain, when will they will be filmed, who will be viewed in the feature, on what software there will be edited on and the structure it would be made up of.
The response that i got from the team was positive, most of them already heard of what i was doing as i worked with a coupe member of the team. I was proud from the work i had done. I had done a lot of work this week, but i knew the work came when it was time for the production of the features.
What has been successful this week was, that i sorted out the location of where the feature would be, who from the outer team would be placed in the feature where partly confirmed. I had also decided and confirmed from the director that i would edit all at home on Final Cut x
I had no changes or development to do this week but i was advise to split up some of the work with the VT operator, as the director advise me to give the snapchat section to the VT operator, as this was one less thing to worry about, as i am still helping the VT operator to get potential people that would be willing to do a snapchat reaction section.

Next week from my job i will be doing a break down of who i will need on specific day for the shoot. i will be organs the location and the equipment that we would need for the following week. I will be also doing a production schedules to confirm to the team and people outside of the time when there will need to come. I will start to film at the end of the week and begin to edit the feature for the show.
Who i worked with this week in the production of this show was the Director, Vision mixer and the presenters this was because i had negotiate when, where and who will be doing specific features. .Who i will be intending to work with next week will be the VT operator, sound mixer, graphics designer and include the people that i also worked with next week.

No comments:
Post a Comment